This project report summarizes work conducted in work package 11. Along with the deliverable 11.1 and milestone report 11 it covers the tasks from work package 11 as formulated in the Description of Work (DoW). The content of the different sections is interrelated, but each section is organized as an independent part. Title of this report differs from DoW because recommendations for optimum design and operation will be handled in the deliverable 12.2. The sections in this report cover various topics and each section can be found as a stand-alone report in the DEMEAU tool box (http://demeaufp7.eu/toolbox/) for download. Detailed summaries can be found for each section separately.
D11.2 Demonstration of MAR effects on groundwater resources – development and application of different approaches for risk and impact assessment